Ensure full HSE compliance on your site with our 12ft x 9ft 2+1 Jackleg Toilet Cabin. Engineered in the UK for construction sites, sports grounds, and outdoor event venues, this heavy-duty portable washroom block features a 2+1 cubicle layout, durable plastisol steel exterior, full internal insulation, and anti-vandal security features. Complete with instant electric water heaters, hygienic wipe-clean surfaces, non-slip flooring, and easy mains plumbing hookups, it provides a turnkey, sanitary solution for workforce welfare.
£9,460.00
Maintaining clean, efficient, and hygienic welfare facilities is essential for construction projects, industrial yards, and outdoor public events. The 12ft x 9ft 2+1 Jackleg Toilet Cabin delivers a robust, mains-connected washroom facility designed specifically to meet UK Health and Safety Executive (HSE) site welfare regulations.
Built with a low-maintenance plastisol steel exterior, this modular jackleg cabin features heavy-duty steel corner posts and fully adjustable leg supports, making site installation fast and stable even on unpaved or sloping ground.
Dual-Access Privacy: Divided into two distinct, lockable entry sections to allow simultaneous use for mixed-gender workforces or separate visitor/staff access.
Sanitary Fixtures: Fitted with commercial-grade ceramic toilets, waterless or flush urinals, and heavy-duty washbasins with foot/hand actuation options.
Insulated Panels: Fully insulated walls, floor, and ceiling maintain interior warmth during winter trading months while preventing interior condensation.
Wipe-Clean Surfaces: Interior walls lined with smooth white washable PVC cladding, allowing fast chemical cleaning and pressure-washing maintenance. jackleg washroom unit construction
Anti-Slip Safety Flooring: Seamless marine plywood sub-floor topped with heavy-duty anti-slip vinyl, welded at the seams to prevent water ingress.
Plug-and-Play Power: Supplied with an internal consumer unit, external commando connection box, high-efficiency LED ceiling lighting, and frost-stat heating.
Instant Hand Washing: Fitted with undersink electric water heaters (e.g., Redring/Ariston units) delivering instant hot water for effective hand hygiene compliance.
| Specification Feature | Metric Measurement | Imperial Measurement | Configuration Details |
| External Length | 3.65 m | 12 ft 0 in | Includes external jackleg levelling posts |
| External Width | 2.74 m | 9 ft 0 in | Standard wide-beam site cabin footprint |
| External Height | 2.59 m | 8 ft 6 in | Ground-to-roof exterior height |
| Layout Division | 2+1 Configuration | — | Dual-compartment setup (e.g., 2 Gents + 1 Ladies or 2 Cubicles + 1 Urinal area) |
| Wall & Roof Construction | Plastisol coated steel exterior with thermal insulation core | — | Low maintenance, weather-resistant, and corrosion protected |
| Levelling Legs | 4 x Heavy-duty adjustable steel jacklegs | — | Allows easy levelling on uneven ground or hardcore beds |
| Plumbing Connections | Standard 110mm soil pipe waste & 15mm cold water inlet | — | Quick-connect mains supply and sewage hookups |
| Electrical Supply | 230V Single-Phase Consumer Unit | — | Pre-wired with LED batten lights, hand dryers, and water heaters |
| Flooring Finish | Commercial-grade, anti-slip safety vinyl with sealed tanked edges | — | Hygienic, easy-to-mop, non-porous floor finish |
Delivery Vehicle: Transported across the UK via HIAB crane lorry for precise placement directly onto your site foundation.
Site Access Requirements: Requires a minimum of 45 ft (13.7 m) straight-line clearance for lorry access and crane arm extension.
Levelling & Foundations: The four corner jacklegs feature threaded adjustment mechanisms, enabling quick levelling on compacted gravel, concrete pads, or asphalt without requiring extensive groundwork.
A mains-connected jackleg toilet cabin connects directly to an onshore freshwater supply and standard sewage line (or effluent holding tank) via standard 110mm waste pipes, eliminating the need for chemical toilet servicing.
The four steel jacklegs at the corners of the cabin allow the unit to be raised and precisely levelled on uneven, sloped, or unpaved ground without requiring a poured concrete foundation.
Yes. The 2+1 layout provides warm running water, proper ventilation, electric heating, hygienic wipe-clean surfaces, and adequate toilet-to-worker ratios required under UK Health and Safety Executive (HSE) regulations.
WhatsApp us